Leven Links
Tuesday, 13 November 2012
November floods
Early November floods
6th fairway
Drainage works starts on the 6th fairway
Drainage 10-20mm chips with a 6" pipe
Andy getting stuck in!!
80m drainage line underway at 16th hole
New walkway from 1st green to 2nd tees
New walkway at the 2nd green to the 3rd tees
Newer Posts
Older Posts
Home
Subscribe to:
Comments (Atom)